PN 15-1 GEOTECHNICAL BORINGS Mile 51.9, Cape Girardeau, MO

  1. USACE Floating Plant will be performing geotechnical soil borings at mile 51.9 UMR, riverward of the Merriweather Pump Station outfall, in the vicinity of the Cape Girardeau City Riverfront. Project Map attached for reference.
  2. Borings will be performed daily starting on 20 April 2015 and ending on 29 April 2015. Work hours will be from 0600 hours to no later than 2100 hours.
  3. During work hours, Floating Plant may extend up to 125 feet riverward of the bankline.
  4. During non-work hours, Floating Plant will be moored upstream of the worksite at the Cape Girardeau City Riverfront.
  5. Floating Plant will consist of the USACE M/V Grand Tower, Fisher Crane and Spud Barge, and drilling barge.
  6. The contact vessel will be the USACE M/V Grand Tower and can be reached on VHF channels 13 and 16 for passing or special instructions.
  7. Mariners are urged to transit at their slowest safe speed to minimize wake and proceed with caution after passing arrangements have been made.

Merriweather_Outfall (Work Area)

 FOR THE DISTRICT ENGINEER:

 //signed//

Andrew C. Schimpf, P.E.

Rivers Project Manager

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s