PN 15-9 – SCHEDULED LOCK CLOSURE Maintenance, Locks 27 Upper Mississippi River, mile 185.5

  1. Locks 27 will be closed on 21 July 2015, from 07:00 to 11:00, for a complete power outage to replace Main Circuit breakers.
  2. All navigation interests should be alert for, and abide by, any special instructions that may be issued by the Lockmaster during this closure.

FOR THE DISTRICT ENGINEER:
//signed//
Andrew C. Schimpf, P.E.
Rivers Project Manager

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s