PN 15-3B SCHEDULED LOCK CLOSURE Mel Price Locks and Dam Upper Mississippi River Mile 200.8

  1. All navigation interests are advised that the 1200-ft, Main Lock, at Mel Price Locks and Dam will be closed on 11 August 2015, from 09:00 to 15:00 for lift gate wire rope inspection.
  2. The 600-ft, Auxiliary Lock, remains closed.
  3. All navigation interest should be alert for, and abide by, any special instructions that may be issued by the
    Lockmaster.

FOR THE DISTRICT ENGINEER:
//signed//
Andrew C. Schimpf, P.E.
Rivers Project Manager

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s