PN 15-17 SCHEDULED LOCK CLOSURE LOCKS 27 AUXILIARY CHAMBER UPPER MISSISSIPPI RIVER, MILE 185.5

  1. The Locks 27 Auxiliary Chamber will be closed on 9 December 2015, from 07:00 to 15:00, for maintenance.
  2. The Locks 27 Main Chamber will be available during this time.
  3. All navigation interest should be alert for, and abide by, any special instructions that may be issued by the Lockmaster

FOR THE DISTRICT ENGINEER:
//signed//
Andrew C. Schimpf, P.E.
Rivers Project Manager

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s